BreakGround IQ Join the pilot
Early pilot now open in Southern California

Know which projects are really moving, and when to show up.

BreakGround IQ follows commercial construction projects from early planning to a finished site: demolition, grading, vertical construction and completion, and who's behind each one. Built for teams that sell into construction.

  • 20,000+ projects tracked, starting in Southern California
  • Seven stages, first signal to finished site
  • Who's involved developer, architect, GC
The problem

A lead list tells you a project exists. Not whether it's moving.

If you sell into construction, timing is the sale. Most project lists are a snapshot of paperwork, and they go stale before you make the call.

Approved isn't started

Plenty of approved projects sit for months or years, and some never break ground. A list can't tell you which ones are actually underway.

Too early or too late

Pitch roofing during grading and you're forgotten. Call after framing and the package is already bought. You need to know the stage, this month.

The people change by stage

The developer and architect matter early; the GC and trades matter once dirt moves. Lists name the players. They don't tell you when each one matters.

What you get

See what a pilot partner sees

A sample of the BreakGround IQ view. Drag the month slider to watch projects move through their stages, tap a pin (or pick a project from the list below) to open its full timeline, and filter what's active this month.

Sample report: illustrative data. Fictional projects, parties and numbers.

Projects by stage in the Southern California pilot

Sample data

    Active this month

    Sample data

      Median months

      Illustrative

        Illustrative numbers. Pilot partners will get these by project type, city, developer and GC.

        Stage by stage

        Know when your window opens

        Each timeline follows the same seven stages, with dates for each. Multi-building sites are reported phase by phase, so Building 1 can be finished while Building 2 is still grading.

        1. 01

          First signal

          The first sign that a project exists.

          Typically involved
          Developer or owner, architect
          Your opportunity
          Get on the developer's and architect's radar early, while products are being specified.
        2. 02

          Approved

          The project has its approvals. Many approved projects wait, or never start, which is why the next stages matter.

          Typically involved
          Developer, architect, civil engineer
          Your opportunity
          Bid lists are forming: GCs and key trades are being lined up.
        3. 03

          Demolition

          On sites with an existing building: it comes down and the site is cleared.

          Typically involved
          Demolition contractor, abatement, hauling
          Your opportunity
          Demolition, abatement, hauling and recycling, fencing and temporary site services.
        4. 04

          Grading & site work

          Earthwork, building pads and underground utilities. Work is real, but nothing is rising yet.

          Typically involved
          Grading contractor, civil engineer, underground utility contractor
          Your opportunity
          Earthwork, aggregates, pipe and utilities, erosion control, equipment rental. The last call before vertical packages are bought.
        5. 05

          Vertical construction

          Foundation, then framing, tilt-up or steel, through roof-on.

          Typically involved
          General contractor, concrete, steel or framing, roofing, MEP trades
          Your opportunity
          Concrete, rebar, steel, lumber and roofing first; then MEP, glazing and doors as the building closes in.
        6. 06

          Building complete

          The building itself is finished and ready to occupy.

          Typically involved
          General contractor, interiors and finish trades, tenant or owner
          Your opportunity
          Finishes, fixtures, racking, low-voltage, furniture and tenant improvements.
        7. 07

          Site complete

          The whole lot is done: paving, striping, landscaping.

          Typically involved
          Paving and landscape contractors, owner or property manager
          Your opportunity
          Paving, landscaping and signage, then service and maintenance contracts for the life of the building.

        Swipe to see all seven stages.

        Who it's for

        Built for the people who sell into construction

        And for anyone who needs to know where construction is really happening, starting in Southern California.

        Suppliers and manufacturers' reps

        See which jobs enter your window this month, and who to call while the order is still open.

        Subcontractor sales and estimating

        Know when grading starts, before the vertical packages go out to bid.

        General contractors

        See which projects are moving, which approved projects stall, and who is on each job.

        Developers and investors

        Compare timelines and completion by project type, city, developer and GC, so you can read a market.

        Why it's different

        The whole timeline, not a single alert

        BreakGround IQ is built on our own models and data. Here is what that means for you.

        Activity, not paperwork

        Approvals and filings say a project could start. We follow when work actually starts, moves to the next stage and finishes.

        First signal to finished site

        A timeline across demolition, grading, vertical construction, the building and the whole site, each with a start and finish date.

        Parties by stage

        Developer or owner, architect and general contractor, tied to the stages they're involved in.

        Phases on multi-building sites

        Building 1 finished while Building 2 is still grading? The timeline reports each building as its own phase.

        Starting in Southern California

        20,000+ projects tracked so far, with a monthly list of what's active now in the areas you choose. More regions are coming, with nationwide coverage the plan.

        Early pilot

        Join the early pilot

        We're opening the pilot to a small group of partners in Southern California, to shape the product around how they sell.

        • Monthly "active now" listsFor the counties, project types and stages that matter to your sales.
        • Project timelines on requestThe stage timeline, phases and who's involved, for the projects you're chasing.
        • A say in what we buildTell us which stages and parties you need, and we'll prioritise them.
        • A direct line to the founderWork directly with our founder while the product takes shape.

        Request a pilot spot

        We'll be in touch to learn what you need.

        We'll only use this to contact you about the pilot. Prefer email? Mike.S@breakgroundiq.com

        For investors

        Building the data layer for construction, starting in Southern California

        BreakGround IQ is an early-stage company building our own models and data on how commercial projects move from early planning to finished site, and which ones get there. It is early: we're opening a pilot with companies that sell into construction. If you invest in construction technology, property technology or data businesses, we'd like to talk.

        Get in touch